Skip to main content
Figure 6 | EURASIP Journal on Wireless Communications and Networking

Figure 6

From: A multi-layered OFDM system with parallel transmission for multicell cooperative cellular networks

Figure 6

The allocated power to different ELs with the proposed power distribution scheme and the optimal power distribution scheme. The BL's capacity loss is 10% and the ELs' proportional reliability constraint is γ1 : γ2 = 1 : 2. The total available transmit power budget for the ELs is assumed to be sufficiently large. The variance of channel estimation error is σ Δ H 2 =0.1. The optimal power distribution uses the exact BER expressions given by [33] instead of the derived BER upper bounds for the proportional reliability constraints.

Back to article page