Skip to main content

Table 8 Cost based on different bpp with N(2,1) and SNR =[0, 4] dB

From: Optimization for image transmission over varying channel with MCMC

Overall bpp Total inputs Cost ratio
0.1563 910 1.01e-005
0.25 916 8.07e-12
0.50 932 5.68e-27
0.75 948 3.24e-42
1.00 964 2.34e-57