Skip to main content

Table 12 Costs per km 2 for 20 MHz/sector for the base case with reuse of sites

From: Techno-economic analysis of femtocell deployment in long-term evolution networks

 

New sites

Upgraded sites

 

Without femtos

With femtos

Without femtos

With femtos

Spectrum

1.279 €

1.279 €

1.279 €

1.279 €

Base stations

140.789 €

223.808 €

140.789 €

223.808 €

Sites

253.599 €

18.739 €

6.784 €

501 €

Backhaul

252.147 €

208.760 €

252.147 €

208.760 €

Backhaul Equipment

351.337 €

180.942 €

351.337 €

180.942 €

Transport network

36.672 €

17.995 €

36.672 €

17.995 €

Overall costs

1.035.824 €

651.523 €

789.009 €

633.285 €