Figure 14

Outage probability vs fixed target (TPC). Outage probability considering a single fixed target for all links with N=7 and P t =28.5 dBm.
Outage probability vs fixed target (TPC). Outage probability considering a single fixed target for all links with N=7 and P t =28.5 dBm.