Skip to main content

Table 7 Parameter configurations for different performance metrics for joint P 0 optimization and FPC in urban scenario

From: Automated uplink power control optimization in LTE-Advanced relay networks

Metric

Method

P0 (dBm)

Direct link

Access link

Relay link

NA

Manual optimization

−51

−61

−55

Γ5%

Taguchi’s method

−51

−68

−57

Simulated annealing

−53

−71

−71

Γ25%

Taguchi’s method

−47

−70

−57

Simulated annealing

−48

−64

−60

Γ50%

Taguchi’s method

−44

−65

−44

Simulated annealing

−44

−65

−52

HM

ΓHM

Taguchi’s method

−55

−72

−54

Simulated annealing

−55

−72

−50

ΓHM10%

Taguchi’s method

−47

−67

−53

Simulated annealing

−47

−67

−60

Weighted AM

ΓAM(1,1,1)

Taguchi’s method

−52

−68

−58

Simulated annealing

−52

−68

−54

ΓAM(2,1,1)

Taguchi’s method

−53

−71

−52

Simulated annealing

−53

−71

−59

ΓAM(1,1,2)

Taguchi’s method

−52

−68

−54

Simulated annealing

−52

−68

−54