Figure 3From: Robust power allocation in two-tier heterogeneous networksOutage probability vs robust parameter for MUEs. The variation of MUEs’ outage probability with the increase of parameter ε m is illustrated, which is compared with worst-case scheme and non-robust scheme when fixing I m t =10 N 0 . The worst-case scheme is assumed to totally capture the uncertainty of channel gain where the outage probability is 0. The outage probability decreases steeply from 18% to 1.8% as Ω m increases from 0 to 0.5. Afterwards, the decreasing rate shows a downward trend till meeting 0 at Ω m = 0.7.Back to article page