Figure 13From: A quantitative study of Cooperative Awareness Messages in production VANETsRate of received CAMs in the A5 and A6 scenarios. Simulated and approximated received CAM rates for the A5 (nlanes = 8) and the A6 (nlanes = 4) scenarios. Received CAM rates above the congestion control threshold are overestimated.Back to article page