From: On the performance of online and offline green path establishment techniques
 | Offline | |||
---|---|---|---|---|
 | AT&T | Abilene | ||
Max req. bw (Mb) | Offline-R | Offline-MO | Offline-R | Offline-MO |
50 | 1.0 | 1.0 | 1.0 | 0.99 |
200 | 0.99 | 0.99 | 0.88 | 0.81 |
400 | 0.96 | 0.94 | 0.71 | 0.62 |
600 | 0.91 | 0.89 | 0.59 | 0.52 |
1000 | 0.82 | 0.79 | 0.47 | 0.42 |
Average | 0.94 | 0.92 | 0.73 | 0.67 |