Fig. 3From: Compressive sampling-based CFO-estimation with exploited featuresThe cost functions of different construction methods, i.e., the proposed FAWC method and WCM method, where N=128, P=128, K=5, and M=64. Three cases, i.e., α=0.1, α=0.9, and α=0.99 are consideredBack to article page