From: Task scheduling algorithm based on fireworks algorithm
Algorithm | Parameter | Value |
---|---|---|
 | Number of fireworks N | 100 |
 | Basic explosion spark number S | 80 |
 | Basic explosive amplitude R | 300 |
IMFWA, FWA | Maximum number of iterations I | 500 |
 | Constant a | 0.80 |
 | Constant b | 0.04 |
 | Individual number N | 100 |
GA | Cross probability | 0.80 |
 | Mutation probability | 0.04 |
 | Maximum number of iterations I | 500 |