Skip to main content

Table 3 Warehouse occupancy between the two methods

From: Wireless management system of prefabricated construction materials based on BIM technology

 

BIM assembly (%)

Traditional assembly (%)

Control group (%)

Production stage

78

42

68

Construction stage

91

54

77