Skip to main content
Fig. 13 | EURASIP Journal on Wireless Communications and Networking

Fig. 13

From: An integrated scheduling algorithm for multi-device-processes with the strategy of exchanging adjacent parallel processes of the same device

Fig. 13

Experimental comparison diagram of experiment 2: The randomly generated data in Experiment 2 were that the number of processes was between 20 and 30, the total processing time of the workpiece was between 50 and 100 and the number of devices is 2, 3 and 5 in Multi-Devices-Process, respectively, this figure shows the comparison of the total processing time of the proposed algorithm and reference [13] algorithm

Back to article page